Sunday, January 10, 2010

Started and Finished:One DAY

An amazing feat has been accomplished at the Banana home.

A whole project, not just started, but also COMPLETED in only one DAY.

I KNOW...I'll let you have a moment to recover from the shock of it all.

You remember our bedroom? Well, that 98% has moved up to 99% complete!

This was the 2% mentioned in that previous entry:
1. See all those wires under the shelf over the bed? That goes to the under shelf lighting, for reading in bed. They are going to be shortened and the switches mounted so it looks less octopus like.
2. See the red inserts in the shelf at the foot of the bed? There will be a set of the drawers mounted on the wall next to each side of the head of the bed for side tables. The will be have a white box around them so it matches the foot of the bed. The table saw is needed and is still buried in the shed.
3. See the head of the bed? A headboard will be made and put there. We are looking for fabric.
4. See the windows? The brown parts will be painted white when it stays warm because the windows have to be taken out to do those parts.
5. See the windows, again? We are still discussing what type of window treatment we want. We are currently thinking about faux wood blinds.
6. See the blank green wall? I have a picture collage to fill up, and some of Surly Teenagers artwork to frame and hang.


Well...
Item #1, under shelf lighting - DONE last February
Item #2, red drawer side tables - DONE bought sometime last year, hung up sometime later last year, white tops (instead of white all the way around) last week
Item #3, headboard-DONE started Saturday and completed THE SAME DAY!

Before.
Don't look at the dusty baseboards.


Back of headboard.


Bracket thing Hubby made to attach to the wall that
will support the headboard.


Brackets on the wall.


Test fit.
(I won't mention that the first time we tried to put it
up it didn't fit. It was too big to fit in between
the side tables.)


The material waiting to be ironed.


Foam padding attached to the headboard
with spray adhesive.


Covered.
Attached to headboard with staple gun.


Hung on wall.


Bed replaced.

Items 4-6, that will bring the bedroom from 99% to 100% complete, are still in progress.

Shut up.



2 comments:

Hubby said...

Well, I am glad that you didn't mention it!

Anonymous said...

hmm, I would have thought you would pick something graphic (as in graphics, not naughty graphic), oma